
5
SECTION 2: LOOSE PARTS & HARDWARE PACK
IMPORTANT:
After assembly, service engine with
gasoline, and check oil level as instructed in the
separate engine manual packed with your unit.
Unpacking
• Remove staples or break glue on the top flaps of
the carton. Remove any loose parts included with
unit (i.e., Operator’s Manual, etc).
• Cut along corners and lay end of carton down flat.
Remove packing material.
• Roll unit out of carton. Check carton thoroughly for
loose parts before discarding.
Tools Required For Assembly
• Pair of pliers
• Two adjustable wrenches
Contents In Carton See Figure 1
• Right and Left Handles
• Handle Panel Assembly
•Chute Assembly
• Chute Directional Control Assembly
• Shift Rod
• Hardware Pack
Figure 1
Handle Panel Assembly
Handles
Chute Directional
Control Assembly
Shift Rod
Chute
Assembly
Comentarios a estos manuales