MTD 249-645A Manual de usuario Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 15
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
MISSISSIPPI
MISSISSIPPI
RIVER
DONALDSONVILLE
BELLE ROSE
PAINCOURTVILLE
NAPOLEONVILLE
SUPREME
LABADIEVILLE
LAC DES ALLEMANDS
PLATTENVILLE
HWY 3127
HWY 70
10-C-3
10-C-4
10-C-6
10-C-7
10-C-12
10-C-13
10-C-14
10-C-15
10-C-16
10-C-17
10-C-18
10-C-20
10-C-21
10-C-22
10-C-23
10-C-24
10-C-25
10-C-26
10-C-27
10-C-28
10-C-29
10-C-30
10-C-31
10-C-5
10-C-8
10-C-9
10-C-19
177889
K ICEMAN
APPROVED-BY
CHECKED-BY
NO
DESCRIPTION
DATE
N
APVR
BAYOU LAFOURCHE
10-C-1
10-C-11
10-C-10
0
6000
12000
18000
Scale In Feet
SMOKE BEND
PUMP STATION
30-C-5
30-C-6
MATCHLINE - SEE SHEET 10-C-2
DONALDSONVILLE
PUMP STATION
30-C-4
REACH 2
REACH 1
REACH 3
REACH 4
REACH 5
REACH 6
REACH 7
REACH 8
REACH 9
REACH 10
REACH 11
REACH 12
REACH 13
REACH 14
REACH 15
KEY PLAN 1
DREDGING REACH
DESIGNATION, TYP
1.
NOTE:
SEE PHASE 2 DESIGN REPORT FOR FURTHER
DESCRIPTION OF DREDGING REACHES.
CIVIL
13
M DUNN
PROJ
DATE
DATE
NO.
DSGN
DR
REVISION
CHK
APVD
BY
APVD
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF
CH2M HILL AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CH2MHILL.
REUSE OF DOCUMENTS:
c
SHEET
DWG
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
0
1"
CH2M HILL 2004. ALL RIGHTS RESERVED.
1 2 3 4 5 6
A
B
C
D
ISSUED FOR 30% REVIEW
APVR
N
DATE
DESCRIPTION
NO
SEPT 2005
MISSISSIPPI RIVER
WATER REINTRODUCTION
INTO BAYOU LAFOURCHE PHASE 2
LOUISIANA DEPARTMENT OF
NATURAL RESOURCES
PRELIMINARY
NOT FOR
CONSTRUCTION
10+00
15+00
20+00
25+00 30+00
35+00
40+00
45+00
50+00
55+00
60+00
65+00
70+00
75+00
80+00
85+00
90+00
95+00
100+00
105+00
110+00
115+00
120+00
125+00
130+00
135+00
140+00
145+00
147+19
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Comentarios a estos manuales

Sin comentarios